Bench Wind Energy Facility

Portfolio Description

In development since 2008 the proposed Bench Wind Energy Facility consists of approximately 10,000 acres of leased agricultural land. The project will consist of up to 30 turbines, an electrical collection system, access roads and the construction of new wind collector substation. The turbines in the project will be connected through a 34.5 kilovolt (kV) underground collector line system that converge at the proposed wind collector substation. The project will have a temporary laydown area during construction and an operations and maintenance building during the life of the project. The project will require construction of new access roads and upgrades to existing roads in the area. These roads will transport materials for turbine assembly during the construction stage, and to access turbines for regular maintenance during operation. PRI will look to the local community where possible during construction for local trades and other business opportunities.

Location Rural Municipality of Carmichael
Capacity (MW) 100
Proposed Construction TBD
Estimated COD TBD
Energy Type Wind energy